EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
VelocityXLRG
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (263)
Research
- (2)
Purchase Kit
- (1)
Workshop
- (7)
Misc. Parts
- (1)
Fuselage
- (81)
Firewall
- (1)
Canard
- (31)
Wings
- (25)
Controls
- (10)
Nose Gear
- (14)
Main Gear
- (21)
-
Retract System &...
-
Sanding
-
Sanding
-
Gear doors
-
Gear doors
-
Booties
-
Gear doors
-
Gear doors
-
Gear doors
-
Gear doors
-
Gear doors
-
Gear doors
-
Fitting Gear Legs
-
Installed Gears
-
Installed Brake Line...
-
Main Gear Installation
-
Sleeve to Support...
-
Wrapped Main Gear in...
-
Wrapped Main Gear in...
-
Gear Door Plates
-
Main Gear Pulley
Avionics
Lighting
Instrument Panel
- (1)
Engine
Propeller
Fuel System
- (62)
Interior Finish
Paint / Decals
- (5)
Inspection
Tools
Auto Entry
- (1)
Builder Name:
Patrick Mayworm
-
Project:
Velocity - XL/RG
-
VIEW REPORTS
Total Hours:
1417
Total Flight Time:
Start/Last Date:
Jul 28, 2001 - No Finish Date
Engine:
Continental IO 550N
Propeller:
Catto
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=VelocityXLRG
Home or Last Project Picture
Feb 25, 2020
Installed Brake Line Straws to Legs
- (7 hours)
Category: Main Gear
Prepared main gear legs for attachment of straws to hold the brake line. Sanded, glued and glassed the straws to both legs. Began to install the flanges to hold the instrument panel and received side sticks to install after panel is leveled.
Layup of Straw on Gear Legs - 25 FEB 2020.jpg
Layup of Straw on Gear Legs 2 - 25 FEB 2020.jpg
Received Sidestick Parts - 25 FEB 2020.jpg
Prep Panel for Flange INstallation - 25 FEB 2020.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.